R series Helical Geared Motor Traits
one. Features:
1. High effectiveness: 92%-ninety seven%
2. Compact construction: Little offset output, two stage and three stage are in the identical box.
three. High precision: the gear is created of substantial-high quality alloy metal forging, carbonitriding and hardening treatment method, grinding approach to make certain high precision and secure running.
four. High interchangeability: highly modular, serial design, powerful flexibility and interchangeability.
2. CZPT parameters
Ratio | three.41-289.74 |
Enter energy | .twelve-160KW |
Output torque | sixty one-23200N.m |
Output pace | 5-415rpm |
Mounting type | Foot mounted, flange mounted, foot and flange mounted, single-stage foot mounted, solitary phase flange mounted, Flange-mounted with prolonged bearing hub |
Enter Technique | Flange enter(AM), shaft input(Advert), inline AC motor input, or AQA servo motor |
Brake Launch | HF-manual launch(lock in the brake launch place), HR-handbook release(autom-atic braking situation) |
Thermistor | TF(Thermistor protection PTC thermisto) TH(Thermistor defense Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Kind | R17-R167 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 high-energy forged iron from R37,forty seven,fifty seven,sixty seven,77,87 |
Housing content | HT250 High power forged iron from R97 107,137,147,157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
Efficiency | 92%-ninety seven% |
CZPT | VG220 |
CZPT Class | IP55, F class |
CZPTshine CZPT
ZheJiang CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould organization, was established in 1965. CZPTshine specializes in the total electricity transmission resolution for substantial-finish equipment manufacturing industries based on the intention of “System Item, Application Design and style and Professional Provider”.
CZPTshine have a powerful technological power with above 350 staff at present, such as over thirty engineering technicians, 30 good quality inspectors, covering an spot of 80000 sq. meters and types of sophisticated processing machines and testing equipments. We have a good basis for the sector application growth and provider of substantial-stop speed reducers & variators owning to the provincial engineering technology research centre,the lab of gear speed reducers, and the base of present day R&D.
Our Staff
CZPT Handle
CZPT:Insist on Improvement,Strive for CZPT With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
CZPT policy:to enhance the overall level in the field of power transmission
CZPT View:Continuous Improvement , pursuit of excellence
CZPT Philosophy:CZPT creates value
three. Incoming CZPT Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, subCZPT goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process CZPT Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Delivery